2 Replies Latest reply: Nov 28, 2012 6:12 AM by midsoup
jan-david Level 1 Level 1 (0 points)

Hi all,

 

I am trying to figure out a way to see how much (and which) material from a particular bin is in my sequence. The thing is, we're working with old 16mm material in our montage and for rights clearing we need to know which clip and for how long it is in the sequence. Does anybody had experience with these kind of functions? I can imagine there is a way to select a bin with al the 16mm material and reveal it in the front sequence. I however can't fin a way to do it,

any help would be wonderful,

 

thanks in advance Jan-David


Final Cut Pro 7, Mac OS X (10.6.8), Mac Pro 8-Core