A little confused about Edit Proxies. Is there a way to have Edit Proxies created during FULL or ADD scans? Right now as I watch my Job Progress window the scans are creating Thumbnails, Poster Frame and Clip Proxies, but not Edit Proxies (even though I have Edit Proxies enabled).