My question is: I how do I manage file sizes of these clips. How do Import them? DO I trim the clips in >the DV file within FCE?
There really is nothing to manage if the DV files are already on your 3 2TB hard drives.
FCE is non-destructive, so all the stuff in the FCE Browser and Timeline are not transferred media files but only file paths (links) to the media already on the 3 2TB drives.
Use the Import Files function to enter the required files to the Browser.
This simply creates a link to the file/s on one of your drives.
Once a file (clip) is in the Browser, move the clip to the Viewer window.
Now is the time to enter in/out points in the Viewer.
When you edit the clip to the Timeline only the selected section between the in/out points will be added. eg. if 10 seconds of a 1 hour clip was selected only the 10 seconds will play in the Timeline.
The Timeline is where the Sequence is built and the Canvas is where you watch it. Canvas and
Timeline are pretty much one and the same.
You can repeat this process on the same clip in as many different places you wish.
When you have grabbed all the bits off that clip in the Viewer move a new clip from the Browser into the Viewer again and edit as above.
I would suggest you make sure the correct Easy Setup in FCE is selected and they match the clips you bring into the FCE Browser as a lot of transcoding seems to have been done. Try a short test FCE Project to make sure all is well before you commit countless hours into your Project.
Al