A problem about the "Max running jobs". Thanks a million!
Hello everyone,
The "Max running jobs" was set to 15.
(1). When I dragged two assets into FCSvr at a time, in the "Search all jobs" window, I saw the first one being uploaded then transcoded, and later the second one being uploaded then transcoded.
(2). When I dragged them into FCSvr one by one, I saw them being uploaded, then the first one being transcoded, and the second one later.
Thus with (2), there is no need to wait or queue between the uploading of the second one and the transcoding of the first one.
However, I intend to drag the assets at the same time, besides, I wanna attain the aim in (2) that no queue to wait. Could someone tell me how to do it?
With best regards,
Steven Lee
PINZ Media
Final Cut Server-OTHER, Mac OS X (10.6.7)