Q: A problem about the "Max running jobs". Thanks a million!

Hello everyone,

 

The "Max running jobs" was set to 15.


(1). When I dragged two assets into FCSvr at a time, in the "Search all jobs" window, I saw the first one being uploaded then transcoded, and later the second one being uploaded then transcoded.

(2). When I dragged them into FCSvr one by one, I saw them being uploaded, then the first one being transcoded, and the second one later.

Thus with (2), there is no need to wait or queue between the uploading of the second one and the transcoding of the first one.

 

However, I intend to drag the assets at the same time, besides, I wanna attain the aim in (2) that no queue to wait. Could someone tell me how to do it?

 

With best regards,

 

Steven Lee

PINZ Media

Final Cut Server, Mac OS X (10.6.7)

Posted on Apr 26, 2011 2:48 AM

Close

Q: A problem about the "Max running jobs". Thanks a million!

  • All replies
  • Helpful answers

  • by ignatiev,

    ignatiev ignatiev May 4, 2011 1:06 PM in response to imStevenLee
    Level 1 (0 points)
    May 4, 2011 1:06 PM in response to imStevenLee

    If I understand, you used for upload menu "Upload file..."

    For uploading and conversation in same time many files you can setup production action (response) for some folder on your device (XSAN, RAID, HDD)

    This action can create production for folder, and create assets for media in folder. The add action "SCAN" in response submenu. For transcoding many assets in same time check radio button "Background Analyze" in response "SCAN".

    You can read more about that in manual.