Changing sequence settings - is it too late?
I am editing a program that contains 4 sequences. For an unknown reson, 2 of the sequences were edited in the wrong size and the wrong timebase.
I need to change them from 144ox1080, 25 fps to 960x720 23.97 fps. I read some entries here that were very discouraging... I ran some tests (including copy & paste into the right settings, converting in Toast, re-rendering, etc) but those didn't work, or required a lot of re-doing (audio out of wack, all picture's scaling and moves are gone, etc).
I am ok with converting upon import, after finishing editing, with any third-pary software, if there is a good way to keep everything intact, and avoid alot of re-doing...
Any suggestions?
I read older entries (2010) which were answeared by Shane Ross, and were very helpful, but I wonder if there anything new and different I can try before giving up and just re-creating the sequences.
Working w FCP 7.0.
thanks you!
Final Cut Pro 7