0 Replies Latest reply: Jan 10, 2013 3:06 PM by kupie1127
kupie1127 Level 1 Level 1 (0 points)

I need an event to repeat every 12 workdays (M-F only). Is that possible?


iMac (24-inch Early 2009), OS X Mountain Lion (10.8.2)