Documents saved with old dates
Hi all
I have a friend who has a problem and hope to find some answers here. The problem is that when he saves a Keynote project
the date (in the finder's "Date modified" section) is set at 31 December 2000, why is this?? He has the latest Keynote on his iMac
and when he does the same thing on his MacBook it doesn't do it. He has checked the date on his iMac and it's on the right day
but when saving his documents it's not on the same date (31 December 2000). What can he do to fix this???
Thanks!!!
Serge
Mac Pro (Mid 2010), OS X Mountain Lion (10.8.5), 13gig mem 2tbyte HDs