Grrr ... Dropping 29.97 fps onto a 24 fps project timeline ... and NOT wanting the the timeline to change frame rates?
Grrr. So I have a 24 fps project timeline. I'm dropping a 29.97 fps clip onto that timeline ... and the timeline is converting to 29.97 fps.
I'm confused. Always in the past when I dropped any frame rate onto a timeline I've chosen to be 24 fps, the clip coming onto that timeline has to convert to the 24 fps. Or I just have to do a Rate Conform.
Now the clip is changing the frame rate of the timeline. I'm going to go make myself an ice cream cone while I wait for someone to explain this to me...
Ben